- Abstract:
- Introduction. When designing a opencast mine, it is necessary to establish the boundaries of the efficiency zone and develop scenarios for the implementation of the project, recommendations for the formation of the working zone of the opencast mine during the operation of the field, taking into account the stochastic nature of the initial geological data. The higher the recoverable value of minerals, the higher the costs of geological exploration are acceptable to reduce the risk of non-confirmation of the initial design information. The uncertainty of the implementation of design solutions for the development of deposits is explained by a number of factors. Methodology. The reliability of the implementation of the adopted design decisions decreases sharply with the increase in the forecasting period. It is inexpedient to make realistic forecasts for more than 15 years due to the growth of project and financial risk over time, as well as the discounting factor. Errors in long-term forecasting are compensated by the fact that the economic value of indicators of the distant future is leveled by the procedure of discounting multi-time costs. Methods of quantitative analysis of project risk are sensitivity analysis, scenario analysis and risk modeling by Monte Carlo. It is expedient to assess the sensitivity of a criterion economic indicator (for example, net present value) to various types of deviations in the initial data accepted at the initial stage of design by developing scenarios for the implementation of the project in various mining and mining and geological conditions, taking into account the volatility of prices and demand in the mineral market. Conclusions. Systematic consideration of scenarios for the development of the working area of the open pit and the construction of its contours is achieved by taking into account the mutual influence of parameters and indicators, such as the angle of slope of the pit wall, the marginal stripping factor, the boundary cut-off content of useful components. Summary. Establishment in the design documentation of the opencast mine productivity that is possible in terms of mining technical factors, close to the production capacity of mining equipment, leads to the absence of a reserve for increasing productivity at the mining enterprise. To ensure the possibility of prompt response to changes in the external conditions of the project implementation, it is advisable to build a reserve of production capacity. On the one hand, the formation and maintenance of reserves reduces the risk of not achieving the design productivity of the opencast mine, and on the other hand, it is associated with additional costs. The creation of reserves provides an opportunity to stabilize the productivity of the open pit in a certain range of volatility of the external conditions of the project implementation.
- Keywords:
- scripts of realization, project, deposit, opencast mining, prediction, reliability, strategies
- For citation:
- Fomin S. I., Lelen A., Govorov A. S. Project decisions reliability assessment of definition opencast mining parameters and indicators. Mine Surveying and Subsurface Use. 2024;(5):60-66. (In Russ.). https://doi.org/10.56195/20793332_2024_5_60_66.
- Information about the authors:
-
- Sergey I. Fomin – Dr. Sci. (Eng.), Professor of the Department of Development of Mineral Deposits, St. Petersburg Mining University of Empress Catherine II, St. Petersburg, Russian Federation, https://orcid. org/0000-0002-0939-1189, e-mail:
This email address is being protected from spambots. You need JavaScript enabled to view it. - Aleksa Lelen – postgraduate student of the department of construction of Development of Mineral Deposits, St. Petersburg Mining University of Empress Catherine II, St. Petersburg, Russian Federation, https://orcid. org/0000-0003-1358-1142, e-mail:
This email address is being protected from spambots. You need JavaScript enabled to view it. - Alexey S. Govorov – postgraduate student of the department of construction of Development of Mineral Deposits, St. Petersburg Mining University of Empress Catherine II, St. Petersburg, Russian Federation, https://orcid. org/0000-0001-9071-862X, e-mail:
This email address is being protected from spambots. You need JavaScript enabled to view it.
- Sergey I. Fomin – Dr. Sci. (Eng.), Professor of the Department of Development of Mineral Deposits, St. Petersburg Mining University of Empress Catherine II, St. Petersburg, Russian Federation, https://orcid. org/0000-0002-0939-1189, e-mail:
- References:
-
- 1. Беляков НН. Моделирование открытых горных работ. Горный информационно-аналитический бюллетень (научно-технический журнал). 2014;(12):45–51. [Belyakov NN. Modeling of open-pit mining. Mining information and analytical bulletin (scientific and technical journal). 2014;(12):45-51 (In Russ.)].
- 2. Бесимбаев НГ, Нагибин АА. Оптимизация этапов развития карьера. Вестник ПНИПУ. Геология. Нефтегазовое и горное дело. 2013;(8):112–119. [Besimbaev NG, Nagibin AA. Optimization of quarry development stages. Bulletin of PNIPU. Geology. Oil and Gas and Mining. 2013;(8):112-9 (In Russ.)].
- 3. Бурмистров КВ, Овсянников МП. Обоснование параметров этапа открытых горных работ в переходные периоды разработки крутопадающих месторождений. Горный информационно-аналитический бюллетень (научно- технический журнал). 2018;(6):20–28. [Burmistrov KV, Ovsyannikov MP. Justification of the parameters of the open-pit mining stage during transition periods of development of steeply dipping deposits. Mining information and analytical bulletin. 2018;(6):20-8 (In Russ.)]. DOI: 10.25018 / 0236-1493-2018-6-0-20-28.
- 4. Галиев ЖК, Галиева НВ. Эффективность функционирования крупных угледобывающих предприятий. Уголь. 2019;6(1119):59–63. [Galiev ZhK, Galieva NV. Efficiency of large coal mining enterprises. 2019. Coal. 2019;6(1119):59-63 (In Russ.)]. DOI: 10.18796 / 0041-5790-2019-6-59-63.
- 5. Зайцев АЮ. Методический подход к обоснованию капитальных вложений золоторудных месторождений на основе удельных затрат. Записки Горного института. 2019;238:459–464. [Zaitsev AYu. Methodological approach to justifying capital investments in gold ore deposits based on specific costs. Notes of the Mining Institute. 2019;238:459-64 (In Russ.)]. DOI: 10.31897/PMI.2019.4.459.
- 6. Земляной МА, Разоренов ЮИ, Денисов АВ. Экономико-математическая модель оценки технологической схемы добычи мергеля с учетом вовлечения в эксплуатацию запасов сдвоенных, строенных добычных уступов. Известия вузов. Северо-Кавказский регион. 2013;3(172):103–106. [Zemlyanoy MA, Razorenov YuI, Denisov AV. Economic and mathematical model for assessing the technological scheme of marl mining taking into account the involvement of reserves of double and triple mining benches in the operation. News of universities. North Caucasian region. Series: Technical sciences. 2013;3(172)103-6 (In Russ.)].
- 7. Катышева ЕГ. Отраслевые особенности формирования собственных финансовых ресурсов на предприятиях горной промышленности. Новый взгляд. Международный научный вестник. 2014;(4):172–185. [Katysheva EG. Industry features of the formation of own financial resources at mining enterprises. New look. International scientific bulletin. 2014; (4):172-85 (In Russ.).]
- 8. Косолапов АИ, Пташник АИ, Пташник ЮП. Исследование возможности вариацией производственной мощностью рудных карьеров при разработке крутопадающих месторождений. Горный информационно- аналитический бюллетень (научно-технический журнал). 2013;(9):55–61. [Kosolapov AI, Plashnik AI, Plashik YuP. Study of the possibility of varying the production capacity of ore quarries during the development of steeply dipping deposits. Mining information and analytical bulletin (scientific and technical journal). 2013;(9):55-61 (In Russ.)].
- 9. Косолапов АИ, Паршина ЕА. Исследование потенциальных возможностей интенсификации производственной мощности карьеров при этапной разработке крутопадающих месторождений в современных условиях. Горный информационно-аналитический бюллетень (научно-технический журнал). 2011;(6):50–66. [Kosolapov AI, Parshina EA. Study of potential possibilities of intensification of production capacity of quarries during staged development of steeply dipping deposits in modern conditions. Mining information and analytical bulletin (scientific and technical journal). 2011;(6):50-66 (In Russ.)].
- 10. Капутин ЮЕ. Горные компьютерные технологии и геостатистика. СПб.: Недра, 2002. 424 с. [Kaputin YuE. Mining computer technologies and geostatistics. St. Petersburg, 2002 (In Russ.)].
- 11. Капутин ЮЕ. Информационные технологии планирования горных работ. СПб.: Недра, 2008. 420 с. [Kaputin YuE. Information technologies for planning mining operations. St. Petersburg, 2008 (In Russ.)].
- 12. Немова НА, Бельш ТА. Оценка вариантов отработки прибортовых и подкарьерных запасов рудника «Олений ручей». Известия ТПУ. 2020;331(2):45–51. [Nemova NA, Belsh TA. Evaluation of development options for the near-pit and under-pit reserves of the Oleniy Ruchey mine. Izvestiya TPU. 2020;331(2):45-51 (In Russ.)].
- 13. Пешкова МХ, Шульгина ОВ. Современные методы оценки инвестиционной привлекательности компаний минерально-сырьевого комплекса. Горный информационно-аналитический бюллетень (научно-технический журнал). 2015;(S1):193–208. [Peshkova MKh, Shulgina OV. Modern methods for assessing the investment attractiveness of companies in the mineral resources complex. Mining Information and Analytical Bulletin (scientific and technical journal). 2015; (S1):193-208 (In Russ.)].
- 14. Ракишев БР. Классификация технологических комплексов открытых горных работ. Горный информационно- аналитический бюллетень (научно-технический журнал). 2014;(S1):297–306. [Rakishev BR. Classification of open-pit mining technological complexes. Mining Information and Analytical Bulletin (scientific and technical journal). 2014; (S1):297-306 (In Russ.)].
- 15. Логинов ЕВ, Тюленева ТА. Управление параметрами карьера в целях повышения эффективности использования гидравлических экскаваторов типа обратная лопата. Уголь.2021;(12):6–10. [Loginov EV, Tyuleneva TA. Management of quarry parameters in order to increase the efficiency of using hydraulic backhoe excavators. Coal. 2021; (12):6-10 (In Russ.)]. DOI 10.18796/0041-5790-2021-12-6-10.
- 16. Ракишев БР. Обоснование порядка формирования рабочих зон на глубоких карьерах при экскаваторно- автомобильных комплексах. Горный информационно-аналитический бюллетень (научно-технический журнал). 2015; (1):27–34. [Rakishev BR, Moldabaev SK. Justification of the procedure for the formation of working zones in deep quarries with excavator-truck complexes. Mining information and analytical bulletin (scientific and technical journal). 2015;(1):27-34 (In Russ.)].
- 17. Соколов ИВ, Смирнов АА, Никитин ИВ. Методика экономической оценки долгосрочных стратегических решений при комбинированной разработке рудных месторождений. Известия ТулГУ. Науки о Земле. 2021;(3):314–325. [Sokolov IV, Smirnov AA, Nikitin IV. Methodology for economic assessment of long-term strategic decisions in the combined development of ore deposits. Bulletin of Tula State University. Earth Sciences. 2021;(3):314-25 (In Russ.)]. DOI:10.46689/2218-5194-2021-3-1-308-319.
- 18. Титова АВ, Голик ВИ. К диверсификации рудодобывающего комплекса как направления развития экономической системы депрессивного типа. Горная промышленность. 2020;(6):112–117. [ Titova AV, Golik VI. Towards diversification of the ore mining complex as a direction for the development of a depressive-type economic system. Mining Industry. 2020;(6):112-7 (In Russ.)]. DOI: 10.30686/1609-9192-2020-6-112-117.
- 19. Толобекова БТ. Особенности принципов управления современными горными проектами. Проблемы науки. 2018;5(29):117–119. [Tolobekova BT. Features of the principles of management of modern mining projects. Problems of Science. 2018;5(29);117-9 (In Russ.)].
- 20. Трубецкой КН, Краснянский ГЛ, Хронин ВВ. Проектирование карьеров: Учебник для вузов: В 2 т. 2-е изд., перераб. и доп. М.: Издательство Академии горных наук, 2001. Т. I. 519 с. [Trubetskoy KN, Krasnyansky GL, Khronin VV. Design of quarries: Textbook. for universities: In 2 volumes. 2nd ed., revised. and enlarged. Moscow, 2001(In Russ.)].
- 21. Blischenko AA. Modern mine survey techniques in the process of mining operations in open-pit mines (quarries). Scientific and Practical Studies of Raw Material Issues. 2019:58-62. DOI: 10.1201/9781003017226-8.
- 22. Пасынков ДВ, Семенов АС. Определение эффективности инвестиций при реализации проектов рудных карьеров. Записки горного института. 2009;180:12–15. [Pasynkov DV, Semenov AS. Determination of investment efficiency in the implementation of ore quarry projects. Notes of the Mining Institute. 2009;180:12-5 (In Russ.)].
- 23. Фомин СИ, Пасынков ДВ, Семенов АС. Определение эффективности инвестиций при реализации проектов рудных карьеров. Записки Горного института. 2009;180:12–14. [Fomin SI, Pasynkov DV, Semenov AS. Determination of investment efficiency in the implementation of ore quarry projects. Notes of the Mining Institute. 2009;180:12-4 (In Russ.)].
- 24. ОВ. Шпанский, Лигоцкий ДН, Борисов ДВ. Проектирование границ открытых горных работ: учеб. Пособие. СПб.: Изд-во СПГГИ(ТУ). 2003. 90 с. [Shpanskiy OV, Ligotsky DN, Borisov DV. Design of open-pit mining boundaries: a tutorial. Plekhanov State Mining Institute (Technical University). St. Petersburg, 2003 (In Russ.)].
- 25. Armstrong M, Lagos T, Emery X, et al. Adaptive open-pit mining planning under geological uncertainty. Resources Policy. 2021;72:515-29. DOI: 10.1016/j.resourpol.2021.102086.
- 26. Фомин СИ, Пасынков ДВ, Семенов АС. Определение эффективности инвестиций при реализации проектов рудных карьеров. Записки Горного института. 2009;180:12-14. [Fomin SI, Pasynkov DV, Semenov AS. Determination of investment efficiency in the implementation of ore quarry projects. Notes of the Mining Institute. 2009;180:12-4 (In Russ.)].
- 27. Череповицын АЕ, Ларичкин ФД, Новосельцева ВД. [и др.] Методические подходы к сценарному планированию в минерально-сырьевом комплексе. Проблемы развития территории. 2017;6(92):53–67. [Cherepovitsyn AE, Larichkin FD, Novoseltseva VD, et al. Methodological approaches to scenario planning in the mineral resource complex. Problems of development of the territory. 2017;6(92):53-67 (In Russ.)].
- 28. Kholmskiy AV, Sidorov DV. Arrangements for increase the efficiency of mining operations on the deep ore mines. Scientific and Practical Studies of Raw Material Issues. 2019:71-4. DOI: 10.1201/9781003017226-10 29.
- 29. Sidorenko AA, Sidorenko SA, Ivanov VV. Numerical modelling of multiple-seam coal mining at the taldinskayazapadnaya-2 mine. ARPN Journal of Engineering and Applied Sciences. 2021;16(5):568-74.
- 30. Koteleva N, Valnev V. Automatic detection of maintenance scenarios for equipment and control systems in industry. Applied Sciences. 2023;13(24):12997. DOI: https://doi.org/10.3390/app132412997.
- 31. Арсентьев АИ. Производительность карьеров. СПб., 2002. 85 с. [Arsentiev AI. Quarry productivity. Saint Petersburg, 2002 (In Russ.)].
- 32. Gilani S-O, Sattarvand J, Hajihassani M, Abdullah SS. A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty. Resources Policy. 2020;68:12997. DOI: 10.1016/ j.resourpol.2020.101738.
- 33. Hustrulid W, Kuchta M. Open Pit Mine: Planning & Design. Rotterdam; Brookfield, VT: A.A. Balkema, 1998. 735 p.
- 34. Hall BE. «How mining companies improve share price by destroying shareholder value» Paper 1194 in Proceedings CIM Mining Conference and Exhibition. – Montreal: Canadian Institute of Mining and Metallurgy, 2003.
- 35. Dimitrakopoulos R, Martinez L, Ramazan S. «Optimizing open pit design with simulated orebodies and Whittle Four- X: A maximum upside/minimum downside approach» In Proceedings of Orebody Modeling and Strategic Mine Planning Symposium, ed. R. Dimitrakopoulos and S. Ramazan. Perth. Australia: The Australasian Institute of Mining and Metallurgy, 2004.