- Abstract:
- In the open development of ore deposits, in order to establish rational volumes of reserves according to the degree of preparation for excavation, it is necessary to compare the amount of damage from equipment outages during blasting and the costs of forming and maintaining a reserve of exploded rock mass. The particular importance in the development of ore deposits is the constancy of the quality of ore supplied for processing. Fluctuations in the content of the mineral components in the mined ore depend on the technological reserve of the exploded ore, which creates the necessary conditions for the formation of a mineral flow of a certain quality. When determining the optimal volume of exploded minerals, it is necessary to take into account possible deviations in their quality from the requirements for the conditions of the enrichment regime. Dependencies influencing the volume of exploded rock mass reserve are considered. It has been proved that the optimal level of ready-to-excavate reserves on mining and overburden horizons will correspond to the minimum of the sum of certain categories of costs during open-pit development. Dependencies were identified and proved in determining the volume of reserves ready for excavation on mining and overburden horizons. The main aim. The purpose of the study was to consider the techniques of definition the optimal transient reserve of exploded rock mass during open mining. Methodology. Technical-economic and mining-technical analysis of determining ore reserves according to the degree of readiness for excavation for mining and technical conditions of steeply dipping ore deposits. Conclusions. To determine the rational volumes of reserves ready for excavation, it is necessary to take into account the mutual influence of the main factors: the cost of moving excavators; losses from maintaining during the year at all levels of reserves necessary for the complete removal of ore above the reserve strip of the working site; losses from an increase in the current stripping ratio; losses from a decrease in the productivity of a quarry for a mineral due to the need to maintain reserves; losses of under fulfillment of the plan due to unsatisfactory demand for the company’s products.
- Keywords:
- ore deposits, opencast mining, exploded rock mass, reserves ready for excavation, reserve, costs, ore quality, optimal volume
- For citation:
- Eroshev A. Yu., Fomin S. I. Rational reserve determination of blasted rock mass during open саst mining of ore deposits. Mine Surveying and Subsurface Use. 2024;(6):56-62. (In Russ.). https://doi.org/10.56195/20793332_2024_6_56_62.
- Information about the authors:
-
- Sergey I. Fomin – Dr. Sci. (Eng.), Professor at the Department of mining, Empress Catherine II Saint Petersburg Mining University, 199106, Saint Petersburg, Russian Federation, https://orcid.org/0000-0002-0939-1189, e-mail:
This email address is being protected from spambots. You need JavaScript enabled to view it. - Andrey Yu. Eroshev – Deputy General Director for Mining and Processing Complex, Kazphosphate LLP (8, Jamal Omarova ul., Almaty, Republic of Kazakhstan), Postgraduate student of VNII Galurgii JSC, 190103, Saint Petersburg, Russian Federation
- Sergey I. Fomin – Dr. Sci. (Eng.), Professor at the Department of mining, Empress Catherine II Saint Petersburg Mining University, 199106, Saint Petersburg, Russian Federation, https://orcid.org/0000-0002-0939-1189, e-mail:
- References:
-
- 1. Fomin SI, Lobyntsev AK. Assessment of the influence of mining factors degree on the standard of prepared reserves when designing open-pit mining of complex-structure ore deposits. Rational development of subsoil. 2021;5:40-3. DOI: 10.26121/RON.2021.52.15.004. (In Russ.).
- 2. Galiev GK, Galieva NV. Efficiency of operation of large coal mining enterprises. Coal. 2019;6(1119):59-63. DOI: 10.18796/0041-5790-2019-6-59-63 (In Russ.).
- 3. Zajcev AJu. Methodical approach to justification of capital investments in gold deposits based on unit costs. Journal of Mining Institute. 2019;238;459-64. DOI: 10.31897/PMI.2019.4.459 (In Russ.).
- 4. Seyyed-Omid GJ, Sattarvand M, Hajihassani SS, et al. Stochastic particle swarm-based model for long term production planning of open pit mines considering the geological uncertainty. Resources Policy. 2020;68:8-12. DOI: 10.1016/j.resourpol.2020.101738.
- 5. Fomin SI, Ivanov VV, Semenov AS, et al. Incremental open-pit mining of steeply dipping ore deposits. ARPN Journal of Engineering and Applied Sciences. 2020;15:1306-11.
- 6. Fomin SI, Govorov AS. Substantiation of the choice of the cut-off content of useful components in the ore in the design of opencast. Mining informational and analytical bulletin (scientific and technical journal). 2023;12:169-78. DOI: 10.25018/0236_1493_2023_12_0_169 (In Russ).
- 7. Vedrova DA, Reshetnyak SP. Methods to improve the waste rock dumping efficiency and reclamation under the north condition. IOP Conference. Series: Earth and Environmental Science. 2020;1(539):012037. DOI: 10.1088/1755-1315/539/1/012037.
- 8. Blischenko АА. Modern mine survey techniques in the process of mining operations in open-pit mines (quarries). Scientific and Practical Studies of Raw Material Issues. 2019:58-62. DOI: 10.1201/9781003017226-8.
- 9. Armstrong М, Lagos T, Emery X, et al. Adaptive open-pit mining planning under geological uncertainty Homem-de-Mello, G. Lagos, D. Saure. Resources. 2021;72:515-29. DOI: 10.1016/j.resourpol.2021.102086.
- 10. Sinha SK, Choudhary BS. Pit Optimization for Improved NPV and Life of Mine in Heterogeneous Iron Ore Deposit. Journal of The Institution of Engineers (India): Series D. 2020;101:253-64. DOI: 10.1007/s40033-020-00236-z.
- 11. Molodykh SS, Ovsyannikov MP, Petrunin AM. Outlook on the implementation of steep inclined conveyors in deep open pits. International Journal of Advanced Re-search in Engineering and Technology (IJARET). 2020;11(5):374-77. DOI: 10.34218/IJARET.11.5.2020.039
- 12. Tolobekova BT. Peculiarities of management principles of modern mining projects. Problems of Science. 2018;5(29):117-19 (In Russ.).
- 13. Alenichev VM, Sytenkov VN, Kornilkov SV, еt al. Open pit mining management strategy. Mining magazine. 2020;3:34-9. DOI: 10.17580/ gzh.2020.03.06/ (In Russ.).
- 14. Zemljanoj MA, Razorenov AV, Denisov AV. Economic and mathematical model for the evaluation of the technological scheme of marl mining, taking into account the involvement in the exploitation of reserves of twin, built-up mining benches. News from universities. North Caucasus Region. Series: Technical Sciences. 2013;(172)103-06 (In Russ.).
- 15. Sokolov IV, Smirnov AA, Nikitin IV. Methodology of economic evaluation of long-term strategic decisions in the combined development of ore deposits. News TulGU. Earth Sciences. 2021;3:314-25. DOI: 10.46689/2218-5194-2021-3-1-308-319 (In Russ.).
- 16. Kholmskiy AV, Sidorov DV. Arrangements for increase the efficiency of mining operations on the deep ore mines. Scientific and Practical Studies of Raw Material Issues. 2019:71-4. DOI: 10.1201/9781003017226-10
- 17. Podkuiko NV, Simonin PV, Vokhmin SA, et al. Relevancy of mineral reserves rating based on preparedness for mining in mines of Norilsk Nickel. Gornyi Zhurnal. 2015;6:51-4. DOI: 10.17580/gzh.2015.06.10 (In Russ.).
- 18. Iskandirov MZ, Lesbekova NU, Tursynbeko SU. Analysis and justification of changes in the normatives of the prepared reserves of the deposits of the mineral resources open ways. Dulaty University. 2019;3:214-19 (In Russ).
- 19. Lushnikov VN, Selivanov DA, Berezhnoy VP. Reliable prediction of geotechnical risks in open pit mining. Mining magazine. 2023;1:4-13. DOI:10.17580/gzh.2023.03.05 (In Russ.).
- 20. Sytenkov VN, Kravchenko VE. Analysis of project established standards for losses on mining of solid minerals. Rational development of subsoil. 2019;6:72-7. DOI: 10.26121/RON.2019.76.85.003 (In Russ.).