- Abstract:
- This paper investigates the ground surface settlement induced by the construction of an underground pedestrian crossing using a pipe-roof structure beneath the railway line of the Moscow Central Diameter No. 1 near 29 Dmitrovskoye Highway. An analysis of soil settlement and the influencing factors at various construction stages was performed based on monitoring data. It was determined that the settlement was caused by insufficient soil compaction and the preservation of its structural properties, deviations from the planned sequence of construction operations, and the absence of void filling between the pipes and the surrounding soil. The study highlights the importance of comprehensive monitoring and preventive measures, including soil reinforcement and the use of stabilizing materials. The obtained results help identify the primary strategies for minimizing settlement and ensuring structural safety during construction in complex engineering-geological conditions. The recommendations provided can be applied to the design of similar structures.
- Keywords:
- Pipe-roof structure, pipe jacking, ground surface settlement, field measurements, tunnel construction
- For citation:
- Roenko M.A. Study of ground surface settlement during the construction of an underground pedestrian crossing using a pipe-roof structure. Mine Surveying and Subsurface Use. 2026;26(1):50-56. (In Russ.). https://doi. org/10.56195/20793332-2026-26-1-50-56.
- Information about the authors:
-
- Maxim A. Roenko – PhD student, Department of Geology and Surveying, Mining Institute, National University of Science and Technology “MISIS”, Moscow, Russian Federation; e-mail:
This email address is being protected from spambots. You need JavaScript enabled to view it.
- Maxim A. Roenko – PhD student, Department of Geology and Surveying, Mining Institute, National University of Science and Technology “MISIS”, Moscow, Russian Federation; e-mail:
- References:
-
- 1. Musso G. Jacked pipe provides roof for underground construction in busy urban area. Civil Engineering. 1979; 49 (11): 79-82. URL: https://www. worldcat.org/oclc/10480594.
- 2. Hemerijckx E. Tubular thrust jacking for underground roof construction on the Antwerp Metro, Part 1. Tunnels and Tunnelling International. 1983; 15 (6): 13-16.
- 3. Hemerijckx E. Tubular thrust jacking for underground roof construction on the Antwerp Metro. Part 2. Tunnels and Tunnelling International. 1983; 15(6): 27-30.
- 4. Park J., Cho I., Lee L., et al. Tunnel reinforcement by using pressure-induced inflatable pipes methods. J. Geotech. Geoenviron. Eng. 2012. 1483-1491. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000725.
- 5. Zhang Z.Q., Li H.Y., Liu H., et al. Load transferring mechanism of pipe umbrella support in shallow-buried tunnels. Tunn. Undergr. Space Technol. 2014; 43 (7): 213-221. https://doi.org/10.1016/j.tust.2014.05.018.
- 6. Heng C.Y., Sun S.S., Zhang J.T., et al. Calculation method of underground passage excavation on interactive effects among pipe-roof, steel bracing and foundation soil. KSCE J. Civ. Eng. 2022; 26 (1): 448-459. https://doi.org/10.1007/s12205-021-0500-4.
- 7. Sun J., Yu X.F., Sun M., et al. Analysis and prediction on soft ground deformation of a super-large shallow burried “pipe-roofing and box-culvert” jacking project under construction. Rock and Soil Mechanics. 2006; 27 (7): 1021-1027.
- 8. Wei G., Wu H.J., Chen C.L. Prediction of settlement induced by ground loss during pipe jacking construction. Rock Soil Mechanics. 2007; 28 (2):359-363.
- 9. Su R.J. Settlement analysis of Steel pipe roof jacking in ultra-shallow covered soft ground. Tunnel Construction. 2018; 38 (7): 1236-1242.
- 10. Yang X., Zhang K.N., Li Y.S., et al. Theoretical and experimental analyses of jacking force during deep-buried pipe jacking. Rock and Soil Mechanics. 2013; 34 (3), 757-761.
- 11. Yang S.S., Wang M., Du J.N., et al. Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method. Tunn. Undergr. Space Technol. 2020; 97: 103277. https://doi.org/10.1016/j.tust.2019.103277.
- 12. Mao H.H., 2007. Reaction distribution investigation and structural analysis of composite thrust wall of rectangular pipe jacking shaft. Rock and Soil Mechanics. 2007; 28 (1), 1212-1216.
- 13. Sun Y., Su J.B., Xia X.H., et al. Numerical analysis of soil deformation behind the reaction wall of an open caisson induced by horizontal parallel pipe-jacking construction. Can. Geotech. J. 2015; 52 (8): 1-9. https://doi.org/10.1139/cgj-2015-0024.
- 14. Bai X.D., Cheng W.C., Sheil B.B., et al. Pipejacking clogging detection in soft alluvial deposits using machine learning algorithms. Tunneling and Underground Space Technology. 2021; 113: 103908. https://doi.org/10.1016/j.tust.2021.103908.
- 15. Bai X.D., Cheng W.C., Li G. A comparative study of different machine learning algorithms in predicting EPB shield behaviour: a case study at the Xi’an metro, China. Acta Geotechnica. 2021; 16 (12), 4061-4080. https://doi.org/10.1007/s11440-021-01383-7.